View Projects

PUBLIC WORKS

Donner Pass Road Intersection Improvements

Truckee, CA

Gary Davis Group was contracted to develop and evaluate options for an intersection of Donner Pass Road and the Town of Truckee’s new Corporation Yard driveway, directly opposite a proposed driveway for a large commercial development. Donner Pass Road is an arterial, with existing slopes of 8% and Caltrans right-of-way on the northern leg of the proposed intersection. The Town desired to eliminate the pre-existing super-elevation in the vicinity of the driveway and reduce longitudinal slopes within the intersection for safety purposes. GDG developed a successful design that provides for the Town’s driveway today, and will accommodate the opposite commercial driveway in the future.